Introduction And History
Shanigaram Project is an existing Medium Irrigation Project constructed across Seddipeta vagu near Shanigaram (V), Koheda (M) in Kharimnagar District.The Project work was completed in the year 1653 and restored to PWD standards in the year 1891.The modernization of Shanigaram project is proposed under APILIP Phase.II.
Location
This Project is constructed across the Siddipet river near Shanigaram village of Koheda mandal of Karimnagar District. This is an age old scheme commissioned in the Kakatiya dynasty.<
Source
Siddipet river
Scope
The scheme is intended to irrigate an ayacut of 5100 Ac.
Inter-State Aspects
There are no Inter-State problems for this Projects.
Components Of the Scheme
Spillway Details(Gated)
Type | FOF weir |
TBL | +361.28m |
FRL | +357.46m |
MWL | +358.99m |
Crest level | +357.49m |
Top Width of Bund | 3.05m |
Left Main Canal
Length | 11.34 Km |
ayacut | 1,993 Acres |
Vent Size , Nos | 0.9m X 0.9m , 2 Nos |
Sill level | +151.18m |
Discharge in Cumecs | 0.878 |
Right Main Canal
Length | 7.91 Km |
Ayacut | 3,108 Acres |
Vent size , Nos | 0.60m X 1.06m , 2nos |
Sill level | +345.95m |
Discharge in Cumecs | 3.609 |
Hydrology
Catchement Area | 124 Sq.Miles |
Capacity | 30.92 M cum |
Utilization | 18.26 Mcum |
Maximum Flood Dischage | 401 Cumecs |
Gross Storage Capacity at FRL | 408.58 Mcft |
Irrigation Potential
The scheme is intended to irrigate an ayacut of 5100 acres benefiting Koheda and Bejjanki mandals.
No comments:
Post a Comment